Ebenal Construction
Monday, April 30, 2018
Contractors must fix 1,750 concrete panels in DC Metrorail's Silver Line expansion
The defects are not expected to create a safety problem but could reduce the lifespan of the panels.
from
https://www.constructiondive.com/news/contractors-must-fix-1750-concrete-panels-in-dc-metrorails-silver-line-ex/522387/
No comments:
Post a Comment
Newer Post
Older Post
Home
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment