Monday, April 30, 2018

Contractors must fix 1,750 concrete panels in DC Metrorail's Silver Line expansion

The defects are not expected to create a safety problem but could reduce the lifespan of the panels.



from
https://www.constructiondive.com/news/contractors-must-fix-1750-concrete-panels-in-dc-metrorails-silver-line-ex/522387/

No comments:

Post a Comment